June 2024
The installation of the Hunter Power Project’s SFC Buildings was a multidisciplinary team effort that required careful planning. The buildings weigh 24 tonnes each and were transported more than 1,500km on a three-day journey from Adelaide before arriving to site in August 2023. The installation took place in an area where Simultaneous Operations (SIMOPs) is vital and attention to detail is required. SIMOPs involves supervisor and trade interactivity on the ground for the coordination of effort and safety. This is a key milestone – unit 1 is on the critical path and is important to the project’s commissioning portion.